New Xactimate Line Items

Looking for more helpful Xactimate estimating information? Check out the Commonly Overlooked Line Items database of Xactimate line items that are often warranted but rarely included in invoices/estimates!

COMMONLY OVERLOOKED LINE ITEMS

August 2022 Price List Changes Report

August 2022 Price List Changes Summary

Structural price list items added for the August 2022 price lists
1. APPGDAIR Garbage disposer air switch (+)
.........................
(-)
Included: Garbage disposer air switch and installation labor.
Quality: Standard finishes. May be single or dual outlet. Includes drilling hole in countertop if needed.

..........................................................................................................................................................................................................
Included: Labor cost to remove a garbage disposer air switch and to discard in a job-site waste receptacle.
2. APPGDAIR+ Garbage disposer air switch - High grade (+)
.........................
(-)
Included: Garbage disposer air switch and installation labor.
Quality: High grade. May be single or dual outlet. Includes drilling hole in countertop if needed.

..........................................................................................................................................................................................................
Included: Labor cost to remove a garbage disposer air switch and to discard in a job-site waste receptacle.
3. DRYCBEAD Corner bead - per LF (+)
.........................
(-)
Included: Metal corner bead, joint compound (mud), screws, and installation labor.
Notes: This item is intended for small repair(s) by a tradesperson already on the job performing additional tasks and/or as an additional line item for jobs with excessive amounts of corner bead compared to the assumptions for the normal drywall line items. This item may also be used when a special trip is required for the corner bead only and the automated minimum adjustment is used.

..........................................................................................................................................................................................................
Included: Labor cost to remove corner bead, including screws and/or nails, and to discard in a job-site waste receptacle.
Notes: Drywall contractors will generally include the removal of the corner bead in the overall per square foot removal price of the drywall. This removal activity is intended to be used when the corner bead is being removed independently of the other drywall on the job. Ultimately, how this is estimated is up to the parties involved.
4. DRYWDR Drywall window return - up to 6" (+)
.........................
(-)
Included: Drywall, metal corner bead, joint/texture compound (mud), joint tape, screws, and installation labor.
Excluded: Heavy or complex texturing or texturing/blending beyond the face of the return.
Notes: This item is intended to be used for repair purposes and as an additional line item in situations where there is an excessive amount of window returns within a specific job. Assumptions are included for a basic finish or a non-complex smooth wall finish or a light machine texture for both the specific area of drywall being replaced and the required blending to match the existing drywall. If additional texture is needed to blend beyond the area being replaced and initial feathering, or if more heavy or complex texturing is being used over the entire surface, etc., then additional line items or adjustments may be needed to compensate.

..........................................................................................................................................................................................................
Included: Labor cost to remove 1/2"" drywall, including screws and/or nails, corner bead, and to discard in a job-site waste receptacle.
Notes: Drywall contractors will generally include the removal of the window return in the overall per square foot removal price of the drywall. This removal activity is intended to be used when the window return is being removed independently of the other drywall on the job. Ultimately, how this is estimated is up to the parties involved.
5. DRYWDR> Drywall window return - greater than 6" (+)
.........................
(-)
Included: Drywall, metal corner bead, joint/texture compound (mud), joint tape, screws, and installation labor.
Excluded: Heavy or complex texturing or texturing/blending beyond the face of the return.
Notes: This item is intended to be used for repair purposes and as an additional line item in situations where there is an excessive amount of window returns within a specific job. Assumptions are included for a basic finish or a non-complex smooth wall finish or a light machine texture for both the specific area of drywall being replaced and the required blending to match the existing drywall. If additional texture is needed to blend beyond the area being replaced and initial feathering, or if more heavy or complex texturing is being used over the entire surface, etc., then additional line items or adjustments may be needed to compensate.

..........................................................................................................................................................................................................
Included: Labor cost to remove 5/8"" drywall, including screws and/or nails, corner bead, and to discard in a job-site waste receptacle.
Notes: Drywall contractors will generally include the removal of the window return in the overall per square foot removal price of the drywall. This removal activity is intended to be used when the window return is being removed independently of the other drywall on the job. Ultimately, how this is estimated is up to the parties involved.
6. FCSDIAGADD Add-on for diagonal stone installation (+) Included: Labor.
Notes: This item is to be figured per SF of area laid in a diagonal (diamond) pattern.
7. MTLRFGGCR Gable cornice return - metal (+)
.........................
(-)
Included: Metal roofing sheets, roofing screws with neoprene washer, and installation labor.
Quality: 29 to 24 gauge metal panel.
Green: LEED considers metallic gable cornice to be green for being manufactured with a minimum of 25% recycled product.
Notes: This item is based on an 18"" wide, 12"" deep gable cornice. Adjustments may be needed for specific metal panel materials.

..........................................................................................................................................................................................................
Included: Labor cost to remove metal roofing from gable cornice return.
8. MTLRFGGCRH Gable cornice return - metal - 2 stories or greater (+)
.........................
(-)
Included: Metal roofing sheets, roofing screws with neoprene washer, and installation labor.
Quality: 29 to 24 gauge metal panel.
Green: LEED considers metallic gable cornice to be green for being manufactured with a minimum of 25% recycled product.
Notes: This item is based on an 18"" wide, 12"" deep gable cornice. Adjustments may be needed for specific metal panel materials.

..........................................................................................................................................................................................................
Included: Labor cost to remove metal roofing from gable cornice return.
9. MTLRFGGCS Gable cornice strip - metal (+)
.........................
(-)
Included: Metal roofing sheets, roofing screws with neoprene washer, and installation labor.
Quality: 29 to 24 gauge metal panel.
Green: LEED considers metallic gable cornice to be green for being manufactured with a minimum of 25% recycled product.
Notes: Adjustments may be needed for specific metal panel materials. Includes 2"" overlap.

..........................................................................................................................................................................................................
Included: Labor cost to remove metal roofing from gable cornice strip.
10. MTLRFGGCSH Gable cornice strip - metal - 2 stories or greater (+)
.........................
(-)
Included: Metal roofing sheets, roofing screws with neoprene washer, and installation labor.
Quality: 29 to 24 gauge metal panel.
Green: LEED considers metallic gable cornice to be green for being manufactured with a minimum of 25% recycled product.
Notes: Adjustments may be needed for specific metal panel materials. Includes 2"" overlap.

..........................................................................................................................................................................................................
Included: Labor cost to remove metal roofing from gable cornice strip.
11. RFGFELLSU- Roofing felt-synthetic- Std. grade- dbl coverage/low slope (+) Included: Synthetic roofing underlayment, roofing nails, and installation labor.
Notes: ""Low-sloped"" typically refers to roofs with a slope of 4/12 or less. Synthetic underlayment products within this grade range may vary in UV exposure limitations, thickness, weight, compatibility with certain types of roofing materials, etc. Verisk recommends estimators verify the material allowance is sufficient for this type of underlayment."
12. RFGFELLSU Roofing felt - synthetic und. - double coverage/low slope (+) Included: Synthetic roofing underlayment, roofing nails, and installation labor.
Notes: ""Low-sloped"" typically refers to roofs with a slope of 4/12 or less. Synthetic underlayment products within this grade range may vary in UV exposure limitations, thickness, weight, compatibility with certain types of roofing materials, etc. Verisk recommends estimators verify the material allowance is sufficient for this type of underlayment.
13. RFGFLP60R Flash parapet wall only - rubber - up to 3' (+)
.........................
(-)
Included: Rubber (EPDM) roofing, seam tape, mechanical fasteners, and installation labor.
Notes: The material assumption for the wall flashing is based on 3 square feet of material per lineal foot.

..........................................................................................................................................................................................................
Included: Labor cost to remove flashing and to discard in a job-site waste receptacle.
14. RFGFLP60R6 Flash parapet wall only - rubber - up to 6' (+)
.........................
(-)
Included: Rubber (EPDM) roofing, seam tape, mechanical fasteners, and installation labor.
Notes: The material assumption for the wall flashing is based on 3 square feet of material per lineal foot.

..........................................................................................................................................................................................................
Included: The material assumption for the wall flashing is based on 6 square feet of material per lineal foot.
15. RFGGCRMTL Gable cornice return – metal (+)
.........................
(-)
Included: Metal roofing sheets, roofing screws with neoprene washer, and installation labor.
Quality: 29 to 24 gauge metal panel.
Green: LEED considers metallic gable cornice to be green for being manufactured with a minimum of 25% recycled product.
Notes: This item is based on an 18"" wide, 12"" deep gable cornice. Adjustments may be needed for specific metal panel materials.

..........................................................................................................................................................................................................
Included: Labor cost to remove metal roofing from gable cornice return.
16. RFGGCRMTLH Gable cornice return - metal - 2 stories or greater (+)
.........................
(-)
Included: Metal roofing sheets, roofing screws with neoprene washer, and installation labor.
Quality: 29 to 24 gauge metal panel.
Green: LEED considers metallic gable cornice to be green for being manufactured with a minimum of 25% recycled product.
Notes: This item is based on an 18"" wide, 12"" deep gable cornice. Adjustments may be needed for specific metal panel materials.

..........................................................................................................................................................................................................
Included: Labor cost to remove metal roofing from gable cornice return.
17. RFGGCSMTL Gable cornice strip - metal (+)
.........................
(-)
Included: Metal roofing sheets, roofing screws with neoprene washer, and installation labor.
Quality: 29 to 24 gauge metal panel.
Green: LEED considers metallic gable cornice to be green for being manufactured with a minimum of 25% recycled product.
Notes: Adjustments may be needed for specific metal panel materials. Includes 2"" overlap.

..........................................................................................................................................................................................................
Included: Labor cost to remove metal roofing from gable cornice strip.
18. RFGGCSMTLH Gable cornice strip - metal - 2 stories or greater (+)
.........................
(-)
Included: Metal roofing sheets, roofing screws with neoprene washer, and installation labor.
Quality: 29 to 24 gauge metal panel.
Green: LEED considers metallic gable cornice to be green for being manufactured with a minimum of 25% recycled product.
Notes: Adjustments may be needed for specific metal panel materials. Includes 2"" overlap.

..........................................................................................................................................................................................................
Included: Labor cost to remove metal roofing from gable cornice strip.
Personal property items added for the August 2022 price lists
1. SPGBKEL- Bicycle - Electric / eBike - Standard grade
2. SPGBKEL Bicycle - Electric / eBike
3. SPGBKEL+ Bicycle - Electric / eBike - High grade
4. SPGBKEL++ Bicycle - Electric / eBike - Premium grade
Structural price list items modified for the August 2022 price lists
1. EQASULG Modified description to reflect a grain bin sweep auger.
2. MBLCT Modified labor component yields in (+) & (-) assemblies.
3. MBLCTONX Modified labor component yields in (+) & (-) assemblies.
4. MBLVTSNK* Modified labor component yield in (-) assembly.
5. RFGFLRIG Modified description to include reference to "hip or ridge."
6. RFGFLRIGC Modified description to include reference to "hip or ridge."
7. RFGRIDGC Modified description to include reference to "hip or ridge."
8. RFGRIDGC+ Modified description to include reference to "hip or ridge."
9. RFGRIDGCC Modified description to include reference to "hip or ridge."
10. RFGRIDGCCF Modified description to include reference to "hip or ridge."
11. RFGRIDGCI Modified description to include reference to "hip or ridge."
12. RFGRIDGCS Modified description to include reference to "hip or ridge."
13. RFGRIDGM Modified description to include reference to "hip or ridge."
14. RFGRIDGMRS Modified description to include reference to "hip or ridge."
15. RFGRIDGT Modified description to include reference to "hip or ridge."
16. RFGRIDGTRS Modified description to include reference to "hip or ridge."
17. RFGRIDGW* Modified description to include reference to "hip or ridge."
Material components added for the August 2022 price lists
1. APPGDAIR Garbage disposer air switch kit
2. APPGDAIR+ Garbage disposer air switch kit - High grade
Miscellaneous changes made for the August 2022 price lists
Changes to Connecticut sales tax jurisdictions: Due to recent conversations with the Connecticut Department of Revenue Services, the following jurisdictions were updated in regards to hazardous waste materials (HMR category): 6.35% Contentds Only, 6.35% Fire Wtr Wind, 6.35% New Constr, 6.35% Res Repr/Remod.
Miscellaneous changes made for the August 2022 price lists
Remapped postal codes 81642 and 81656 from the Grand Junction, CO (COGJ) price list area to the Resort, CO (CORE) price list area.
Fuel cost increases were included in the Retail Labor Rates for the August 2022 publication based on the national average increase of fuel between May 23, 2022 and June 13, 2022. Retail Labor Rates for the USA were increased a minimum of $0.40 per hour and in Canada a minimum of $0.28 per hour.
Possible future changes and/or additions under review for upcoming price list publications
Item(s) / add-on item(s) for installing fencing in cold weather or difficult areas.
Item(s) for oak hollow core bifold doors.
Item(s) for insulation board in the siding category.
us-video-frame" > (+)
.........................
(-) Included: Rubber (EPDM) roofing, seam tape, mechanical fasteners, and installation labor.
Notes: The material assumption for the wall flashing is based on 3 square feet of material per lineal foot.

..........................................................................................................................................................................................................
Included: Labor cost to remove flashing and to discard in a job-site waste receptacle. 14. RFGFLP60R6 Flash parapet wall only - rubber - up to 6' (+)
.........................
(-) Included: Rubber (EPDM) roofing, seam tape, mechanical fasteners, and installation labor.
Notes: The material assumption for the wall flashing is based on 3 square feet of material per lineal foot.

..........................................................................................................................................................................................................
Included: The material assumption for the wall flashing is based on 6 square feet of material per lineal foot. 15. RFGGCRMTL Gable cornice return – metal (+)
.........................
(-) Included: Metal roofing sheets, roofing screws with neoprene washer, and installation labor.
Quality: 29 to 24 gauge metal panel.
Green: LEED considers metallic gable cornice to be green for being manufactured with a minimum of 25% recycled product.
Notes: This item is based on an 18"" wide, 12"" deep gable cornice. Adjustments may be needed for specific metal panel materials.

..........................................................................................................................................................................................................
Included: Labor cost to remove metal roofing from gable cornice return. 16. RFGGCRMTLH Gable cornice return - metal - 2 stories or greater (+)
.........................
(-) Included: Metal roofing sheets, roofing screws with neoprene washer, and installation labor.
Quality: 29 to 24 gauge metal panel.
Green: LEED considers metallic gable cornice to be green for being manufactured with a minimum of 25% recycled product.
Notes: This item is based on an 18"" wide, 12"" deep gable cornice. Adjustments may be needed for specific metal panel materials.

..........................................................................................................................................................................................................
Included: Labor cost to remove metal roofing from gable cornice return. 17. RFGGCSMTL Gable cornice strip - metal (+)
.........................
(-) Included: Metal roofing sheets, roofing screws with neoprene washer, and installation labor.
Quality: 29 to 24 gauge metal panel.
Green: LEED considers metallic gable cornice to be green for being manufactured with a minimum of 25% recycled product.
Notes: Adjustments may be needed for specific metal panel materials. Includes 2"" overlap.

..........................................................................................................................................................................................................
Included: Labor cost to remove metal roofing from gable cornice strip. 18. RFGGCSMTLH Gable cornice strip - metal - 2 stories or greater (+)
.........................
(-) Included: Metal roofing sheets, roofing screws with neoprene washer, and installation labor.
Quality: 29 to 24 gauge metal panel.
Green: LEED considers metallic gable cornice to be green for being manufactured with a minimum of 25% recycled product.
Notes: Adjustments may be needed for specific metal panel materials. Includes 2"" overlap.

..........................................................................................................................................................................................................
Included: Labor cost to remove metal roofing from gable cornice strip.
Personal property items added for the August 2022 price lists
1. SPGBKEL- Bicycle - Electric / eBike - Standard grade
2. SPGBKEL Bicycle - Electric / eBike
3. SPGBKEL+ Bicycle - Electric / eBike - High grade
4. SPGBKEL++ Bicycle - Electric / eBike - Premium grade
Structural price list items modified for the August 2022 price lists
1. EQASULG Modified description to reflect a grain bin sweep auger.
2. MBLCT Modified labor component yields in (+) & (-) assemblies.
3. MBLCTONX Modified labor component yields in (+) & (-) assemblies.
4. MBLVTSNK* Modified labor component yield in (-) assembly.
5. RFGFLRIG Modified description to include reference to "hip or ridge."
6. RFGFLRIGC Modified description to include reference to "hip or ridge."
7. RFGRIDGC Modified description to include reference to "hip or ridge."
8. RFGRIDGC+ Modified description to include reference to "hip or ridge."
9. RFGRIDGCC Modified description to include reference to "hip or ridge."
10. RFGRIDGCCF Modified description to include reference to "hip or ridge."
11. RFGRIDGCI Modified description to include reference to "hip or ridge."
12. RFGRIDGCS Modified description to include reference to "hip or ridge."
13. RFGRIDGM Modified description to include reference to "hip or ridge."
14. RFGRIDGMRS Modified description to include reference to "hip or ridge."
15. RFGRIDGT Modified description to include reference to "hip or ridge."
16. RFGRIDGTRS Modified description to include reference to "hip or ridge."
17. RFGRIDGW* Modified description to include reference to "hip or ridge."
Material components added for the August 2022 price lists
1. APPGDAIR Garbage disposer air switch kit
2. APPGDAIR+ Garbage disposer air switch kit - High grade
Miscellaneous changes made for the August 2022 price lists
Changes to Connecticut sales tax jurisdictions: Due to recent conversations with the Connecticut Department of Revenue Services, the following jurisdictions were updated in regards to hazardous waste materials (HMR category): 6.35% Contentds Only, 6.35% Fire Wtr Wind, 6.35% New Constr, 6.35% Res Repr/Remod.
Miscellaneous changes made for the July 2022 price lists
Remapped postal codes 81642 and 81656 from the Grand Junction, CO (COGJ) price list area to the Resort, CO (CORE) price list area.
Fuel cost increases were included in the Retail Labor Rates for the July 2022 publication based on the national average increase of fuel between May 23, 2022 and June 13, 2022. Retail Labor Rates for the USA were increased a minimum of $0.40 per hour and in Canada a minimum of $0.28 per hour.
Possible future changes and/or additions under review for upcoming price list publications
Item(s) / add-on item(s) for installing fencing in cold weather or difficult areas.
Item(s) for oak hollow core bifold doors.
Item(s) for insulation board in the siding category.