Price List Update Summary - August 2022
New Xactimate Line Items
Looking for more helpful Xactimate estimating information? Check out the Commonly Overlooked Line Items database of Xactimate line items that are often warranted but rarely included in invoices/estimates!
COMMONLY OVERLOOKED LINE ITEMSAugust 2022 Price List Changes Report
August 2022 Price List Changes Summary
| Personal property items added for the August 2022 price lists |
|---|
| 1. SPGBKEL- Bicycle - Electric / eBike - Standard grade |
| 2. SPGBKEL Bicycle - Electric / eBike |
| 3. SPGBKEL+ Bicycle - Electric / eBike - High grade |
| 4. SPGBKEL++ Bicycle - Electric / eBike - Premium grade |
| Material components added for the August 2022 price lists |
|---|
| 1. APPGDAIR Garbage disposer air switch kit |
| 2. APPGDAIR+ Garbage disposer air switch kit - High grade |
| Miscellaneous changes made for the August 2022 price lists |
|---|
| Changes to Connecticut sales tax jurisdictions: Due to recent conversations with the Connecticut Department of Revenue Services, the following jurisdictions were updated in regards to hazardous waste materials (HMR category): 6.35% Contentds Only, 6.35% Fire Wtr Wind, 6.35% New Constr, 6.35% Res Repr/Remod. |
| Miscellaneous changes made for the August 2022 price lists |
|---|
| Remapped postal codes 81642 and 81656 from the Grand Junction, CO (COGJ) price list area to the Resort, CO (CORE) price list area. |
| Fuel cost increases were included in the Retail Labor Rates for the August 2022 publication based on the national average increase of fuel between May 23, 2022 and June 13, 2022. Retail Labor Rates for the USA were increased a minimum of $0.40 per hour and in Canada a minimum of $0.28 per hour. |
| Possible future changes and/or additions under review for upcoming price list publications |
|---|
| Item(s) / add-on item(s) for installing fencing in cold weather or difficult areas. |
| Item(s) for oak hollow core bifold doors. |
| Item(s) for insulation board in the siding category. |
.........................
(-)
Notes: The material assumption for the wall flashing is based on 3 square feet of material per lineal foot.
..........................................................................................................................................................................................................
Included: Labor cost to remove flashing and to discard in a job-site waste receptacle.
.........................
(-)
Notes: The material assumption for the wall flashing is based on 3 square feet of material per lineal foot.
..........................................................................................................................................................................................................
Included: The material assumption for the wall flashing is based on 6 square feet of material per lineal foot.
.........................
(-)
Quality: 29 to 24 gauge metal panel.
Green: LEED considers metallic gable cornice to be green for being manufactured with a minimum of 25% recycled product.
Notes: This item is based on an 18"" wide, 12"" deep gable cornice. Adjustments may be needed for specific metal panel materials.
..........................................................................................................................................................................................................
Included: Labor cost to remove metal roofing from gable cornice return.
.........................
(-)
Quality: 29 to 24 gauge metal panel.
Green: LEED considers metallic gable cornice to be green for being manufactured with a minimum of 25% recycled product.
Notes: This item is based on an 18"" wide, 12"" deep gable cornice. Adjustments may be needed for specific metal panel materials.
..........................................................................................................................................................................................................
Included: Labor cost to remove metal roofing from gable cornice return.
.........................
(-)
Quality: 29 to 24 gauge metal panel.
Green: LEED considers metallic gable cornice to be green for being manufactured with a minimum of 25% recycled product.
Notes: Adjustments may be needed for specific metal panel materials. Includes 2"" overlap.
..........................................................................................................................................................................................................
Included: Labor cost to remove metal roofing from gable cornice strip.
.........................
(-)
Quality: 29 to 24 gauge metal panel.
Green: LEED considers metallic gable cornice to be green for being manufactured with a minimum of 25% recycled product.
Notes: Adjustments may be needed for specific metal panel materials. Includes 2"" overlap.
..........................................................................................................................................................................................................
Included: Labor cost to remove metal roofing from gable cornice strip.
| Personal property items added for the August 2022 price lists |
|---|
| 1. SPGBKEL- Bicycle - Electric / eBike - Standard grade |
| 2. SPGBKEL Bicycle - Electric / eBike |
| 3. SPGBKEL+ Bicycle - Electric / eBike - High grade |
| 4. SPGBKEL++ Bicycle - Electric / eBike - Premium grade |
| Material components added for the August 2022 price lists |
|---|
| 1. APPGDAIR Garbage disposer air switch kit |
| 2. APPGDAIR+ Garbage disposer air switch kit - High grade |
| Miscellaneous changes made for the August 2022 price lists |
|---|
| Changes to Connecticut sales tax jurisdictions: Due to recent conversations with the Connecticut Department of Revenue Services, the following jurisdictions were updated in regards to hazardous waste materials (HMR category): 6.35% Contentds Only, 6.35% Fire Wtr Wind, 6.35% New Constr, 6.35% Res Repr/Remod. |
| Miscellaneous changes made for the July 2022 price lists |
|---|
| Remapped postal codes 81642 and 81656 from the Grand Junction, CO (COGJ) price list area to the Resort, CO (CORE) price list area. |
| Fuel cost increases were included in the Retail Labor Rates for the July 2022 publication based on the national average increase of fuel between May 23, 2022 and June 13, 2022. Retail Labor Rates for the USA were increased a minimum of $0.40 per hour and in Canada a minimum of $0.28 per hour. |
| Possible future changes and/or additions under review for upcoming price list publications |
|---|
| Item(s) / add-on item(s) for installing fencing in cold weather or difficult areas. |
| Item(s) for oak hollow core bifold doors. |
| Item(s) for insulation board in the siding category. |