Price List Update Summary - February 2026

New Xactimate Line Items

Looking for more helpful Xactimate estimating information? Check out the Commonly Overlooked Line Items database of Xactimate line items that are often warranted but rarely included in invoices/estimates!

COMMONLY OVERLOOKED LINE ITEMS

February 2026 Price List Changes Report

February 2026 Price List Updates Summary

Upcoming Major Additions / Modifications for next month’s 2026 Publication
1: Add items for high grade vinyl cove base molding.
2: Add items for power washing to the PNT (Painting) category.
3: Review Low-E definitions for applicable items in the window categories.
4: Review material associations and definition qualifiers for the snaplock laminate floor series of items.
5: Adding new RFG 300- Standard grade laminated shingle item, including corresponding series of items, for the May publication.
6: Incorporating major brands and product series into the laminated shingle definitions for the new RFG 300- series of items and the RFG 300 series of items for the May publication.
Structural price list items added for the February 2026 price lists
1: CABVENDOR Cabinet Vendor Report/Assessment (Bid Item) (+) (+)
Notes: Cabinet repair assessment following a water or fire event. Bid Item.
2: HMRASBPLA Tear off asbestos plaster (no haul off) (-) (-)
Included: Labor cost to remove asbestos plaster (including lath, if applicable) and to bag for disposal.
Excluded: Asbestos testing, containment barriers (HMR BARR), dump/disposal fees (HMR HWD for hazardous waste disposal), personal protective equipment (HMR PPE*).
Quality: 6 mil bags.
Notes: Debris is double bagged. The labor type used in this item is a hazardous materials remediation technician, who typically performs work relating to hazardous materials, which may include asbestos, lead, mold, etc. Pricing can have a wide variance based on several factors, such as method of removal, condition of plaster, presence and/or type of lath, company's pricing structure, etc. Verisk recommends comparing with specific local costs/bids and making adjustments as necessary.
3: HMRWEP Window exhaust port (+) (+)
Included: Lumber, fasteners, tape, coupling, and labor.
Excluded: Ducting.
Notes: Materials and labor to create an exhaust opening/port for a window when using negative pressure in an area.
4: TMPTARPI Tarp - lift & inspect only - per sq ft (+) (+)
Included: Labor to lift existing tarp, assess/inspect damage, and re-secure existing tarp.
Notes: Item is intended for unfastening and lifting sections of previously installed tarp for assessing and inspecting damage, and for re-securing tarp.
5: TMPTARPSI Tarp w/sandbags - lift & inspect only - per sq ft (+) (+)
Included: Labor to lift existing tarp, assess/inspect damage, and re-secure existing tarp.
Notes: Item is intended for unfastening and lifting sections of previously installed tarp with sandbags for assessing and inspecting damage, and for re-securing tarp.
6: WTRWEP Window exhaust port (+) (+)
Included: Lumber, fasteners, tape, coupling, and labor.
Excluded: Ducting.
Notes: Materials and labor to create an exhaust opening/port for a window when using negative pressure in an area.
Structural price list material components added for the February 2026 price lists
1: BOLT3/8X10C Carriage bolt - 3/8" x 10" - zinc coated
2: BOLTW2/8X2 Fender washer - 3/8" x 2" - zinc coated
3: NUT3/8Z Nut - 3/8" - zinc coated
Structural price list items modified for the February 2026 price list
1: FRMBLK Modified labor component yield in (+) and (-) assemblies.
2: FRMRFO Modified labor component yield in (+) assembly.
3: INSHWRAP* Modified material component yield of house wrap in (+) assembly.
4: MTLPP Modified material component yield of house wrap in (+) assembly.
5: SDGHWRAP* Modified material component yield of house wrap in (+) assembly.
Structural price list material components modified for the February 2026 price lists
1: INSHWRAP Modified unit type from LF to SF.
Miscellaneous changes made for the February 2026 price lists
Modified the New Construction Labor Efficiency labor supporting events for CLN-LAB (from 7.292% to 13.542%), CLNT-LAB (from 12.5% to 17.708%), and CON-LAB (from 5.208% to 13.542%).