Price List Update Summary - July 2026

New Xactimate Line Items

Looking for more accurate and consistent Xactimate estimates? Check out Actionable Profile, a powerful estimating tool that provides live guidance, industry-standard alerts, and built-in macros to help reduce overages, omissions, and common estimating mistakes.

Learn more about Actionable Profile

July 2026 Price List Changes Report

July 2026 Price List Updates Summary

Upcoming Major Additions / Modifications for next month’s 2026 Publication
1: Review cabinet line item assumptions.
2: Review finish flooring items for clarity.
Structural price list items added for the July 2026 price lists
1: ELEIBB Intersystem bonding bridge (+ / -) (+)
Included: Intersystem bonding bridge, grounding lugs, concrete anchors, grounding wire, and installation labor.
Quality: UL-listed, corrosion-resistant metal unit with stainless steel hardware and a weather-resistant protective cover.
(-)
Included: Labor cost to remove an intersystem bonding bridge and to discard in a job-site waste receptacle.
2: ELEMBR Meter mast bracing kit for roof (+ / -) (+)
Included: Meter mast bracing kit, roofing cement, and installation labor.
Quality: Roofing kit may include rigid or guy wire type bracing for up to 3" diameter mast.
(-)
Included: Labor cost to remove mast bracing and to discard in a job-site waste receptacle.
3: EQUSKIDD< Mini skid steer loader (per day) - no operator (+) (+)
Included: Mini skid steer loader.
Quality: Stand-on.
Excluded: Equipment operator.
Notes: Daily charge for equipment.
4: EQUSKIDM< Mini skid steer loader (per month) - no operator (+) (+)
Included: Mini skid steer loader.
Quality: Stand-on.
Excluded: Equipment operator.
Notes: Monthly charge for equipment.
5: EQUSKIDW< Mini skid steer loader (per week) - no operator (+) (+)
Included: Mini skid steer loader.
Quality: Stand-on.
Excluded: Equipment operator.
Notes: Weekly charge for equipment.
6: HVCFRRBL Furnace repair - blower motor (+) (+)
Included: Blower motor and replacement labor.
7: HVCFRRBR Furnace repair - burner (+) (+)
Included: Burner and replacement labor.
Notes: Price based on the replacement of a single burner. Price may need to be adjusted if multiple burners need to be replaced.
8: HVCFRRCB Furnace repair - control board (+) (+)
Included: Control board and replacement labor.
9: HVCFRRFS Furnace repair - flame sensor (+) (+)
Included: Flame sensor and replacement labor.
10: HVCFRRHE Furnace repair - heat exchanger (+) (+)
Included: Heat exchanger and replacement labor.
11: HVCFRRIG Furnace repair - ignitor (+) (+)
Included: Ignitor and replacement labor.
12: HVCFRRLS Furnace repair - limit switch (+) (+)
Included: Limit switch and replacement labor.
13: SPEWVRS Weathervane - Detach & reset (+) (+)
Included: On-site storage and labor.
Excluded: Any additional materials or hardware.
Notes: Labor cost to detach a weathervane, store on site, and reinstall at a later time.
14: WTRACT3N Remove wet ceiling tile & drywall, no bagging - Cat 3 (-) (-)
Included: Labor cost to remove wet, Category 3 water-damaged drywall and attached ceiling tiles, including nails and screws, and to discard in a job-site waste receptacle.
Excluded: Bagging.
Notes: A premium charge is used for working with sewage contaminated materials.
15: WTRACT3NA Remove wet ceiling tile & drywall, no bagging-Cat 3 aft hrs (-) (-)
Included: Labor cost to remove wet, Category 3 water-damaged drywall and attached ceiling tiles, including nails and screws, and to discard in a job-site waste receptacle.
Excluded: Bagging.
Notes: A premium charge is used for working with sewage contaminated materials and for working after normal business hours.
16: WTRACTASN Remove wet ceiling tile w/staples, no bagging (-) (-)
Included: Labor cost to remove wet ceiling tiles attached with staples to furring strips (includes removal of the staples) and to discard in a job-site receptacle.
Excluded: Bagging.
17: WTRACTASNA Remove wet ceiling tile w/staples, no bagging - after hours (-) (-)
Included: Labor cost to remove wet ceiling tiles attached with staples to furring strips (includes removal of the staples) and to discard in a job-site receptacle.
Excluded: Bagging.
Notes: A premium charge is used after normal business hours.
18: WTRACTN Remove wet ceiling tile & drywall, no bagging (-) (-)
Included: Labor cost to remove drywall and attached ceiling tiles, including nails and screws, and to discard in a job-site receptacle.
Excluded: Bagging.
19: WTRACTNA Remove wet ceiling tile & drywall, no bagging - after hours (-) (-)
Included: Labor cost to remove drywall and attached ceiling tiles, including nails and screws, and to discard in a job-site receptacle.
Excluded: Bagging.
Notes: A premium charge is used after normal business hours.
20: WTRACTS3N Remove wet ceiling tile w/staples, no bagging - Cat 3 (-) (-)
Included: Labor cost to remove wet, Category 3 water-damaged ceiling tiles attached with staples to furring strips (includes removal of the staples) and to discard in a job-site waste receptacle.
Excluded: Bagging.
Notes: A premium charge is used for working with sewage contaminated materials.
21: WTRACTS3NA Remove wet ceiling tile w/staples, no bag - Cat 3 after hrs (-) (-)
Included: Labor cost to remove wet, Category 3 water-damaged ceiling tiles attached with staples to furring strips (includes removal of the staples) and to discard in a job-site waste receptacle.
Excluded: Bagging.
Notes: A premium charge is used for working with sewage contaminated materials and for working after normal business hours.
22: WTRACTSN Remove wet suspended ceiling tile, no bagging (-) (-)
Included: Labor cost to remove suspended acoustical ceiling tile and to discard in a job-site receptacle.
Excluded: Bagging.
23: WTRACTSNA Remove wet susp. ceiling tile, no bagging - after hours (-) (-)
Included: Labor cost to remove suspended acoustical ceiling tile and to discard in a job-site receptacle.
Excluded: Bagging.
Notes: A premium charge is used after normal business hours.
24: WTRACTSSN Remove wet suspended ceiling tile, no bagging - Cat 3 (-) (-)
Included: Labor cost to remove wet, Category 3-damaged suspended acoustical ceiling tile and to discard in a job-site waste receptacle.
Excluded: Bagging.
Notes: A premium charge is used for working with sewage contaminated materials.
25: WTRACTSSNA Remove wet suspended ceiling tile, no bag - Cat 3 after hrs (-) (-)
Included: Labor cost to remove wet, Category 3-damaged suspended acoustical ceiling tile and to discard in a job-site waste receptacle.
Excluded: Bagging.
Notes: A premium charge is used for working with sewage contaminated materials and for working after normal business hours.
26: WTRTACKN Tear out tackless strip, no bagging (-) (-)
Included: Labor cost to remove tackless strip and to discard in a job-site waste receptacle.
Excluded: Bagging.
27: WTRTACKNA Tear out tackless strip, no bagging - after hours (-) (-)
Included: Labor cost to remove tackless strip and to discard in a job-site waste receptacle.
Excluded: Bagging.
Notes: A premium charge is used after normal business hours.
Canada only structural price list items added for the July 2026 price lists
1: FRMULD Underlayment - dimple - 5/32" - 1/4" overall thickness (+ / -) (+)
Included: Underlayment, seam tape, and labour to install.
Quality: 5/32" to 1/4" dimple underlayment; installed for moisture barrier and/or mold reduction membrane.
Notes: This item should be used when the underlayment is being installed during the framing or finish carpentry phase.
(-)
Included: Labour cost to remove underlayment and to discard in a job-site waste receptacle.
2: FRMULD> Underlayment - dimple - over 1/4" overall thickness (+ / -) (+)
Included: Underlayment, seam tape, and labour to install.
Quality: Over 1/4" thick dimple underlayment; installed for moisture barrier and/or mold reduction membrane.
Notes: This item should be used when the underlayment is being installed during the framing or finish carpentry phase.
(-)
Included: Labour cost to remove underlayment and to discard in a job-site waste receptacle.
Structural equipment components added for the July 2026 price lists
1: SKIDSTEER< Mini skid steer loader
2: SKIDSTEERM< Mini skid steer loader (per month)
3: SKIDSTEERW< Mini skid steer loader (per week)
Structural material components added for the July 2026 price lists
1: ELEIBB Intersystem bonding bridge
2: ELEMBR Meter mast bracing kit for roof
Structural price list items modified for the July 2026 price list
1: ELSSOLARP Modified Quality field of (+) definition to reference range in wattage.
2: ELSSOLARP> Modified Quality field of (+) definition to reference range in wattage.
3: LABSUPERR Modified Note field of (+) definition to clarify a typical single-family detached rebuild or new build generally requires significantly fewer hours per weekday, while larger multi-family or multi-unit projects may warrant full-time formal supervision.
4: RFGBRCFRS Modified description, (+) assembly, and (+) definition to include electrical mast roof bracing kits and assumptions for roofing cement.
5: RFGSTEP* Added default calculation.
6: SFGDICE* Added text to Note field of (+) definition to clarify intent of line item.
7: SPEWV* Added ( R ) activity.
8: WTRCB Modified description, labor component yield, and Excluded definition to clarify item is for tearing out material "up to Category 3" and excludes bagging.
9: WTRCBA Modified description, labor component yield, and Excluded definition to clarify item is for tearing out material "up to Category 3" and excludes bagging.
10: WTRCBB* Modified labor component yield in (-) assembly.
11: WTRTACK Modified labor component yield in (-) assembly.
12: WTRTACKA Modified labor component yield in (-) assembly.
13: WTRTACKSN* Modified labor component yield in (-) assembly.
Structural price list material components modified for the July 2026 price lists
1: ELSSLRP< Modified description to reference range in wattage.
2: ELSSLRP> Modified description to reference range in wattage.
Miscellaneous changes made for the July 2026 price lists
1: Added descriptive text to Note field of the (+) definitions of various items within the following Personal Property Item categories: CMP, HSW, LGP, OFS, SPG, and TOL.