Price List Update Summary - March 2022

New Xactimate Line Items

Looking for more helpful Xactimate estimating information? Check out the Commonly Overlooked Line Items database of Xactimate line items that are often warranted but rarely included in invoices/estimates!

COMMONLY OVERLOOKED LINE ITEMS

March 2022 Price List Changes Report

March 2022 Price List Changes Summary

Structural price list items added for the March 2022 price lists
1. PLMSWRSG Steam shower/bath generator - up to 8kw (+)
.........................
(-)
Included: Steam generator, control, steamhead, and labor to install.
Quality: Steam generator, up to 8.9kw, with control and polished nickel steamhead or equal.

..........................................................................................................................................................................................................
Included: Labor to remove steam generator and control with steam head and to discard in a job-site waste receptacle.
2. PLMSWRSG> Steam shower/bath generator - 9kw to 15kw (+)
.........................
(-)
Included: Steam generator, control, steamhead, and labor to install.
Quality: Steam generator, 9kw to 15kw, with control and polished nickel steamhead or equal.

..........................................................................................................................................................................................................
Included: Labor to remove steam generator and control with steam head and to discard in a job-site waste receptacle.
3. RFGADDRF Add. layer of felt/underlayment, remove & disp. (-) Included: Dump fees, hauling, disposal, and labor to remove additional layers of felt/underlayment.
Notes: This item should be used if additional/multiple layers of felt/underlayment are to be removed and disposed of (i.e., more layers than the standard/common installation practices for felt/underlayment; this item is not intended to be used for the base layer of felt already being removed with the roofing material). Price per additional layer; however, removing multiple layers of felt may have some efficiencies, estimators should review and compare their specific costs and make adjustments if necessary. Removal cost is based on hauling done with contractor's own equipment. If haul off is to be estimated separately or if the removal is being estimated with a dumpster (DMO DUMP*) or other equipment, use item RFG ADDRFN.
4. RFGADDRFN Add. layer of felt/underlayment, remove (no haul off) (-) Included: Labor to remove additional layers of felt/underlayment.
Excluded: Haul off and dump fees.
Notes: This item should be used if additional/multiple layers of felt/underlayment are to be removed (i.e., more layers than the standard/common installation practices for felt/underlayment; this item is not intended to be used for the base layer of felt already being removed with the roofing material). Price per additional layer; however, removing multiple layers of felt may have some efficiencies, estimators should review and compare their specific costs and make adjustments if necessary.
5. WTRCTTL Tear out non-salv. tile countertop & bag for disposal (-) Included: Plastic bags and labor.
Excluded: Tear out/removal of subdeck.
Notes: Labor cost to remove and bag non-salvageable tile countertop and to discard in a job-site waste receptacle.
6. WTRCTTLA Tear out non-salv. tile countertop & bag for disp- aft hrs (-) Included: Plastic bags and labor.
Excluded: Tear out/removal of subdeck.
Notes: Labor cost to remove and bag non-salvageable tile countertop and to discard in a job-site waste receptacle. A premium charge is used after normal business hours.
7. WTRCTTLN Tear out non-salvageable tile countertop, no bagging (-) Included: Labor cost to remove non-salvageable tile countertop and to discard in a job-site waste receptacle.
Excluded: Bagging. Tear out/removal of subdeck.
8. WTRCTTLNA Tear out non-salv. tile countertop, no bagging - aft hrs (-) Included: Labor cost to remove non-salvageable tile countertop and to discard in a job-site waste receptacle.
Excluded: Bagging. Tear out/removal of subdeck.
Notes: A premium charge is used after normal business hours.
9. WTRCTTLS Tear out non-salv. tile countertop & bag - Cat 3 water (-) Included: Plastic bags and labor.
Excluded: Tear out/removal of subdeck.
Reference: IICRC S500 5th Edition standards.
Notes: Labor cost to remove and bag non-salvageable tile countertop and to discard in a job-site waste receptacle. A premium charge is used when working with sewage contaminated materials.
10. WTRCTTLSA Tear out non-salv. tile countertop & bag-Cat 3 wtr-aft hr (-) Included: Plastic bags and labor.
Excluded: Tear out/removal of subdeck.
Reference: IICRC S500 5th Edition standards.
Notes: Labor cost to remove and bag non-salvageable tile countertop and to discard in a job-site waste receptacle. A premium charge is used when working with sewage contaminated materials and after normal business hours.
11. WTRCTTLSN Tear out non-salv. tile countertop, no bag - Cat 3 water (-) Included: Labor cost to remove non-salvageable tile countertop and to discard in a job-site waste receptacle.
Excluded: Bagging. Tear out/removal of subdeck.
Reference: IICRC S500 5th Edition standards.
Notes: A premium charge is used when working with sewage contaminated materials.
12. WTRCTTLSNA Tear out non-salv. tile countertop, no bag- Cat 3- aft hrs (-) Included: Labor cost to remove non-salvageable tile countertop and to discard in a job-site waste receptacle.
Excluded: Bagging. Tear out/removal of subdeck.
Reference: IICRC S500 5th Edition standards.
Notes: A premium charge is used when working with sewage contaminated materials and after normal business hours.
Structural price list items modified for the March 2022 price lists
1. CLNFINAL* Modified text in Note field of (+) definition to help further clarify the intent of the item.
2. CLNJST* Modified text in Note field of (+) definition to clarify item would include cleaning all sides of exposed joists, including one side of sheathing if present, and to clarify many factors could ultimately affect pricing.
3. DRYTEX Modified labor component yield in (+) assembly.
4. DRYTEX- Modified equipment and labor component yields in (+) assembly.4.
5. DRYTEX+ Modified labor component yield in (+) assembly.
6. DRYTEX++ Modified labor component yield in (+) assembly.
7. DRYTEXMK Modified equipment and labor component yields in (+) assembly.
8. HMRCLNJS* Modified text in Note field of (+) definition to clarify item would include cleaning all sides of exposed joists, including one side of sheathing if present, and to clarify many factors could ultimately affect pricing.
9. LABCLN-R Modified description to reference "per hour" to match similar items in the category.
10. PLMWHTE* Modified description to reference "kw" to match similar items.
11. WTRDRYMA Added text to Note field of (+) definition to clarify the combination of this item added with an air mover item may also cover smaller single-unit wall cavity drying equipment.
Sturctural material components added for the March 2022 price lists
1. PLMSTEAM> Steam generator - 9kw to 15kw
2. PLMSTEAMC Steam generator - control & steamhead
3. PLMSTEAMC+ Steam generator - control & steamhead - High grade
Structural material components modified for the March 2022 price lists
1. PLMSTEAM Modified description to reference steam kit up to 8kw.
Miscellaneous changes made for the March 2022 price lists
Remapped postal codes 55349, 55363, 55390 from the Saint Cloud, MN (MNSC) price list area to the Minneapolis, MN (MNMN) price list area.
Updated the Worker Wage portion of the Retail Labor Rates for various areas in United States and Canada.
Future changes and additions to look for in upcoming price list publications
1. Item(s) for full home surge protector.
2. Item(s) for dry fogging for mold.
3. Possible item(s) / add-on item(s) for installing fencing in cold weather or difficult areas.
4. Item(s) for drywall returns for commercial windows.

Comments


User_Picture