Price List Update Summary - May 2026

New Xactimate Line Items

Looking for more helpful Xactimate estimating information? Check out the Commonly Overlooked Line Items database of Xactimate line items that are often warranted but rarely included in invoices/estimates!

COMMONLY OVERLOOKED LINE ITEMS

May 2026 Price List Changes Report

May 2026 Price List Updates Summary

Upcoming Major Additions / Modifications for next month’s 2026 Publication
1: Add item(s) for painting/staining split rail fencing.
2: Add item(s) for no-bagging tear out of vinyl tile and vinyl additional layers in WTR category.
3: Review of yields for items ELE WIRE & ELE REWIRE.
Structural price list items added for the May 2026 price lists
1: CABFHD Cabinetry - full height unit - Detach (+) (+)
Included: On-site storage and labor.
Notes: Labor cost to detach full height cabinet unit and store on site. To reattach see item CAB FHR.
2: CABLOWD Cabinetry - lower (base) units - Detach (+) (+)
Included: On-site storage and labor.
Notes: Labor cost to detach cabinet unit and store on site. To reattach see item CAB LOWR.
3: CABLOWSD Cabinetry - lower(base) -w/shoring - Detach/Remove (Add on) (+) (+)
Included: On-site storage, shoring material, and additional labor charge for removing/detaching a lower cabinet while preserving the countertop with shoring.
Excluded: Any additional materials, hardware, or manipulation of countertop, sink, or appliances.
Notes: This item is intended to be used as an add on with applicable lower or base cabinet line items in situations where cabinets are detached or removed and shoring is installed to preserve the countertop.
4: CABUPD Cabinetry - upper (wall) units - Detach (+) (+)
Included: On-site storage and labor.
Notes: Labor cost to detach cabinet unit and store on site. To reattach see item CAB UPR.
5: CABVAND Vanity - Detach (+) (+)
Included: On-site storage and labor.
Excluded: Any additional materials, hardware, or manipulation of vanity top or faucet and sink.
Notes: Labor cost to detach cabinet unit and store on site. To reattach see item CAB VANR.
6: CABVANTD Vanity with countertop - Detach (+) (+)
Included: On-site storage and labor.
Excluded: Any additional materials, hardware, or manipulation of faucet and sink.
Notes: Labor cost to detach a vanity with countertop and store on site. This item is for situations where vanity cabinet and countertop are removed together, as one piece. To reattach see item CAB VANTR.
7: FCVNFCPUD Underlayment - dimple - per specs from ind. analysis (+ / -) (+)
Notes: For when an independent third party is used to analyze the existing dimple underlayment and recommend a like kind & quality replacement. The default line item includes seam tape and labor. You will need to update the price of the FCVNFCPUD material component when the analysis is complete. Do this from the material components window in the estimate.
(-)
Included: Labor cost to remove underlayment and to discard in a job-site waste receptacle.
8: FCVUD< Underlayment - dimple - up to 4 mil (+ / -) (+)
Included: Underlayment, seam tape, and labor to install.
Quality: Up to 4 mil dimple underlayment; installed for moisture barrier and/or mold reduction membrane.
(-)
Included: Labor cost to remove underlayment and to discard in a job-site waste receptacle.
9: FCVUD Underlayment - dimple - 5-7 mil (+ / -) (+)
Included: Underlayment, seam tape, and labor to install.
Quality: 5 to 7 mil dimple underlayment; installed for moisture barrier and/or mold reduction membrane.
(-)
Included: Labor cost to remove underlayment and to discard in a job-site waste receptacle.
10: FCVUD> Underlayment - dimple - 8 mil or greater (+ / -) (+)
Included: Underlayment, seam tape, and labor to install.
Quality: 8 mil or greater dimple underlayment; installed for moisture barrier and/or mold reduction membrane.
(-)
Included: Labor cost to remove underlayment and to discard in a job-site waste receptacle.
11: FCWNFCPUD Underlayment - dimple - per specs from ind. analysis (+ / -) (+)
Notes: For when an independent third party is used to analyze the existing dimple underlayment and recommend a like kind & quality replacement. The default line item includes seam tape and labor. You will need to update the price of the FCWNFCPUD material component when the analysis is complete. Do this from the material components window in the estimate.
(-)
Included: Labor cost to remove underlayment and to discard in a job-site waste receptacle.
12: FCWUD< Underlayment - dimple - up to 4 mil (+ / -) (+)
Included: Underlayment, seam tape, and labor to install.
Quality: Up to 4 mil dimple underlayment; installed for moisture barrier and/or mold reduction membrane.
(-)
Included: Labor cost to remove underlayment and to discard in a job-site waste receptacle.
13: FCWUD Underlayment - dimple - 5-7 mil (+ / -) (+)
Included: Underlayment, seam tape, and labor to install.
Quality: 5 to 7 mil dimple underlayment; installed for moisture barrier and/or mold reduction membrane.
(-)
Included: Labor cost to remove underlayment and to discard in a job-site waste receptacle.
14: FCWUD> Underlayment - dimple - 8 mil or greater (+ / -) (+)
Included: Underlayment, seam tape, and labor to install.
Quality: 8 mil or greater dimple underlayment; installed for moisture barrier and/or mold reduction membrane.
(-)
Included: Labor cost to remove underlayment and to discard in a job-site waste receptacle.
15: FEEELEC Electricity Consumption Fee (Bid Item) (+) (+)
Notes: Bid item.
16: HMRASBEN- Apply asbestos fiber encapsulating compound - diluted (+) (+)
Included: Asbestos fiber encapsulating compound and labor.
Quality: Water-based asbestos fiber encapsulating compound, diluted to 1:4 ratio.
Notes: Treatment to encapsulate remaining asbestos fibers after removing asbestos-containing materials with a diluted material compound. This item is priced per square foot of surface area of the material being encapsulated. Different types of encapsulant products, application thickness, dilution ratio, etc. may affect the cost. It is recommended users verify and compare their local material and unit costs and make any adjustments if necessary.
17: RFG300- Laminated - Standard grd - comp. shingle rfg. - w/ felt (+ / -) (+)
Included: Laminated composition shingles, 15 pound roofing felt, roofing nails, and installation labor.
Quality: Standard grade entry level architectural/laminated shingle with a uniform granule blend and a standard dimensional appearance. Product weight typically ranges approximately 200 to 250 lbs. per square. Examples include GAF Timberline NS, IKO Cambridge, Owens Corning Oakridge, Tamko Heritage, and similar products. Estimators should compare roof-stocked material costs to Xactimate material component pricing to confirm proper item alignment.
Notes: Pricing reflects local nailing code requirements. The price is based on the material being roof-stocked (as opposed to in-store shelf price). Consideration may be needed for situations such as abnormal material delivery/pick-up, delivery outside of normal range, small material quantities, etc. that result in additional costs. The estimator should verify that the component allowances are sufficient for the actual material and associated delivery costs.
Reference: Verisk publishes prices as close to the mid-point of the market as possible. As a result, generally half of the providers in each market will be priced higher, and half lower than the cost shown here. Due to the structure at which different roofing companies operate (traditional sub-contractors vs. roofing sales organizations) roofing costs quoted by local providers can cover a very broad / large range of prices.
(-)
Included: Dump fees, hauling, disposal, and labor to remove composition shingles and felt.
Notes: If additional layers are to be removed and disposed of, use additional item RFG ADDRM>. Removal cost is based on hauling done with contractor's own equipment. If haul off is to be estimated separately or if the removal is being estimated with a dumpster (DMO DUMP*) or other equipment, use item RFG ARMVN>.
18: RFG300E- Laminated - Standard grd - comp. shingle rfg (per SHINGLE) (+ / -) (+)
Included: Shingles, roofing nails, roofing cement, and installation labor.
Quality: Standard grade entry level architectural/laminated shingle with a uniform granule blend and a standard dimensional appearance. Product weight typically ranges approximately 200 to 250 lbs. per square. Examples include GAF Timberline NS, IKO Cambridge, Owens Corning Oakridge, Tamko Heritage, and similar products. Estimators should compare roof-stocked material costs to Xactimate material component pricing to confirm proper item alignment.
Notes: Due to the nature of replacing individual shingles on a roof, there may be contractors that are hesitant to warranty and/or quote unit pricing for this type of unique repair. As such, this item cost is based on an assumed allowance of estimated time and material needed to effect the per shingle repair. This item is to be used only for minor spot damage due to wind or hail etc. Pricing reflects local nailing code requirements.
(-)
Included: Labor cost to carefully remove damaged shingles and to discard in a job-site waste receptacle.
19: RFG300S- Laminated - Standard grd - comp. shingle rfg. - w/out felt (+ / -) (+)
Included: Laminated composition shingles, roofing nails, and installation labor.
Excluded: Roofing felt underlayment.
Quality: Standard grade entry level architectural/laminated shingle with a uniform granule blend and a standard dimensional appearance. Product weight typically ranges approximately 200 to 250 lbs. per square. Examples include GAF Timberline NS, IKO Cambridge, Owens Corning Oakridge, Tamko Heritage, and similar products. Estimators should compare roof-stocked material costs to Xactimate material component pricing to confirm proper item alignment.
Notes: Pricing reflects local nailing code requirements. The price is based on the material being roof-stocked (as opposed to in-store shelf price). Consideration may be needed for situations such as abnormal material delivery/pick-up, delivery outside of normal range, small material quantities, etc. that result in additional costs. The estimator should verify that the component allowances are sufficient for the actual material and associated delivery costs.
Reference: Verisk publishes prices as close to the mid-point of the market as possible. As a result, generally half of the providers in each market will be priced higher, and half lower than the cost shown here. Due to the structure at which different roofing companies operate (traditional sub-contractors vs. roofing sales organizations) roofing costs quoted by local providers can cover a very broad / large range of prices.
(-)
Included: Dump fees, hauling, disposal, and labor to remove composition shingles and felt.
Notes: If additional layers are to be removed and disposed of, use additional item RFG ADDRM>. Removal cost is based on hauling done with contractor's own equipment. If haul off is to be estimated separately or if the removal is being estimated with a dumpster (DMO DUMP*) or other equipment, use item RFG ARMVN>.
20: RFGNRP300- Lam. - Std grd - comp shng w/felt - per ind. mat. source (+ / -) (+)
Notes: Pricing reflects local nailing code requirements. For when an independent third party is used to supply the main material component. The default line item includes all labor, felt, and nails. You will need to update the price of the RFGNRP300- material component. Do this from the material components window in the estimate.
(-)
Included: Dump fees, hauling, disposal, and labor to remove composition shingles and felt.
Notes: If additional layers are to be removed and disposed of, use additional item RFG ADDRMV. Removal cost is based on hauling done with contractor's own equipment. If haul off is to be estimated separately or if the removal is being estimated with a dumpster (DMO DUMP*) or other equipment, use item RFG ARMVN.
21: RFGNRP30S- Lam. - Std grd - comp shng w/out felt- per ind. mat. source (+ / -) (+)
Notes: Pricing reflects local nailing code requirements. For when an independent third party is used to supply the main material component. The default line item includes all labor and nails. You will need to update the price of the RFGNRP300- material component. Do this from the material components window in the estimate.
(-)
Included: Dump fees, hauling, disposal, and labor to remove composition shingles.
Notes: If additional layers are to be removed and disposed of, use additional item RFG ADDRMV. Removal cost is based on hauling done with contractor's own equipment. If haul off is to be estimated separately or if the removal is being estimated with a dumpster (DMO DUMP*) or other equipment, use item RFG ARMVN.
22: SDGREST Vinyl siding restoration - (Bid Item) (+) (+)
Notes: Bid item for restoration or repairs to vinyl siding.
23: WDVREST Vinyl window restoration - (Bid Item) (+) (+)
Notes: Bid item for restoration or repairs to vinyl window.
Structural price list material components added for the May 2026 price lists
1: FCUSD< Underlayment - dimple - up to 4 mil
2: FCUSD Underlayment - dimple - 5-7 mil
3: FCUSD> Underlayment - dimple - 8 mil or greater
4: FCVNFCPUD Underlayment - dimple - mat per specs from ind. analysis
5: FCWNFCPUD Underlayment - dimple - mat per specs from ind. analysis
6: FCWST Underlayment seam tape
7: RFG300- Laminated - Standard grade - comp. shingle
8: RFGNRP300- Laminated- Std grd- comp shng-per specs from ind mat source
Structural price list items modified for the May 2026 price list
1: CABFHR Modified Note field of (+) definition to reference the existing cabinet unit has been previously detached.
2: CABLOWR Modified Note field of (+) definition to reference the existing cabinet unit has been previously detached.
3: CABLOWSR Modified description and Note field of (+) definition to clarify item is intended as an add on with applicable lower or base cabinet line items in situations where cabinets are reset or installed when shoring has been installed to preserve the countertop.
4: CABUPR Modified Note field of (+) definition to reference the existing cabinet unit has been previously detached.
5: CABVANR Modified Note field of (+) definition to reference the existing cabinet unit has been previously detached.
6: CABVANTR Modified Note field of (+) definition to reference the existing cabinet unit has been previously detached.
7: CELTV<+ Modified labor component yield in (+) assembly.
8: CELTV+ Modified labor component yield in (+) assembly.
9: CELTVLS+ Modified labor component yield in (+) assembly.
10: CELTVLS>* Modified Note field of (+) definition to reference screen size over 59".
11: CELTVVCR+ Modified labor component yield in (+) assembly.
12: CELTVVCR>+ Modified labor component yield in (+) assembly.
13: FCCCT* Added text to Note field of (+) definition to clarify the main material component waste included.
14: FCCNFCPCT Added text to Note field of (+) definition to clarify the main material component waste included.
15: FCWEXPF Added text to Note field of (+) definition to clarify the main material component waste included.
16: FNCCMH Added ( R ) activity.
17: FNCCNRH Added ( R ) activity.
18: FNCCNRPL Added ( R ) activity.
19: HVCHCSP* Modified labor component yield in (+) assembly.
20: PLA2 Modified (+) definition and assembly to include material assumption for bonding agent if needed.
21: PLATHIN Modified (+) definition and assembly to include material assumption for bonding agent if needed.
22: RFG300/300S Updated Quality field of (+) definitions to “Average grade architectural/laminated shingle with a multi-tone granule blend designed to create greater visual depth and dimensional appearance. Product weight typically ranges approximately 200 to 250 lbs. per square. Examples include CertainTeed Landmark, GAF Timberline HDZ, IKO Dynasty, Owens Corning TruDefinition Duration, and similar products. Estimators should compare roof-stocked material costs to Xactimate material component pricing to confirm proper item alignment.”
23: RFGSTEEP* Modified labor component yield in (+) and (-) assemblies.
24: SDGNSP* Added text to Note field of (+) definition to clarify a contractor will generally have and use standard ladders, jacks, and plank scaffolding as part of their normal equipment toolset.
25: WDSRWFL* Modified Included and Quality fields of (+) definition and description to clarify item is for flashing kit for skylights/roof windows.
26: WTRFCT Modified Note field of (-) definition to clarify removal of thinset is included.
27: WTRFCTA Modified Note field of (-) definition to clarify removal of thinset is included.
28: WTRFCTN* Modified Included field of (-) definition to clarify removal of thinset is included.
29: WTRFCTS Modified Note field of (-) definition to clarify removal of thinset is included.
30: WTRFCTSA Modified Note field of (-) definition to clarify removal of thinset is included.
31: WTRFCTSN* Modified Included field of (-) definition to clarify removal of thinset is included.
32: WTRTIL Modified Note field of (-) definition to clarify removal of thinset is included.
33: WTRTILA Modified Note field of (-) definition to clarify removal of thinset is included.
34: WTRTILN* Modified Included field of (-) definition to clarify removal of thinset is included.
35: WTRTILS Modified Note field of (-) definition to clarify removal of thinset is included.
36: WTRTILSA Modified Note field of (-) definition to clarify removal of thinset is included.
37: WTRTILSN* Modified Included field of (-) definition to clarify removal of thinset is included.

Comments


User_Picture