Price List Update Summary - October 2026

New Xactimate Line Items

Looking for more accurate and consistent Xactimate estimates? Check out Actionable Profile, a powerful estimating tool that provides live guidance, industry-standard alerts, and built-in macros to help reduce overages, omissions, and common estimating mistakes.

Learn more about Actionable Profile

October 2026 Price List Changes Report

October 2026 Price List Updates Summary

Upcoming Major Additions / Modifications for next month’s 2026 Publication
1: Add item(s) for scraping/removing drywall texture.
2: Add item(s) for wood floor registers in the FCW category.
3: Add additional drywall per LF items.
4: Add item(s) for ribbed panel agricultural roofing.
5: Add item(s) for exterior door jamb and strike plate.
6: Clarify gutter guard product types in item definitions.
7: Add item for material handling.
Structural price list items added for the October 2026 price lists
1: DRYMST8<+ Metal studding, 8" wide, 24" OC, 20 gauge (+ / -) (+)
Included: Metal runner channel and studs, powder actuated drive pins (including shot), pan head screws, and installation labor.
Quality: 20 gauge, 8" wide, non-welded metal stud framing. Studs are set 24" on center (OC).
(-)
Included: Labor cost to remove metal studding and to discard in a job-site waste receptacle.
2: DRYMST8+ Metal studding, 8" wide, 16" OC, 20 gauge (+ / -) (+)
Included: Metal runner channel and studs, powder actuated drive pins (including shot), pan head screws, and installation labor.
Quality: 20 gauge, 8" wide, non-welded metal stud framing. Studs are set 16" on center (OC).
(-)
Included: Labor cost to remove metal studding and to discard in a job-site waste receptacle.
3: FRMMS814< Metal studding, 8" wide, 24" OC, 14 gauge (+ / -) (+)
Included: Metal runner channel and studs, powder actuated drive pins (including shot), pan head screws, bridging, and installation labor.
Quality: 14 gauge, 8" wide, metal stud framing. Studs are set 24" on center (OC).
Excluded: Structural headers and cross bracing.
(-)
Included: Labor cost to remove metal studding and to discard in a job-site waste receptacle.
4: FRMMS814 Metal studding, 8" wide, 16" OC, 14 gauge (+ / -) (+)
Included: Metal runner channel and studs, powder actuated drive pins (including shot), pan head screws, bridging, and installation labor.
Quality: 14 gauge, 8" wide, metal stud framing. Studs are set 16" on center (OC).
Excluded: Structural headers and cross bracing.
(-)
Included: Labor cost to remove metal studding and to discard in a job-site waste receptacle.
5: FRMMS814> Metal studding, 8" wide, 12" OC, 14 gauge (+ / -) (+)
Included: Metal runner channel and studs, powder actuated drive pins (including shot), pan head screws, bridging, and installation labor.
Quality: 14 gauge, 8" wide, metal stud framing. Studs are set 12" on center (OC).
Excluded: Structural headers and cross bracing.
(-)
Included: Labor cost to remove metal studding and to discard in a job-site waste receptacle.
6: FRMMS816< Metal studding, 8" wide, 24" OC, 16 gauge (+ / -) (+)
Included: Metal runner channel and studs, powder actuated drive pins (including shot), pan head screws, bridging, and installation labor.
Quality: 16 gauge, 8" wide, metal stud framing. Studs are set 24" on center (OC).
Excluded: Structural headers and cross bracing.
(-)
Included: Labor cost to remove metal studding and to discard in a job-site waste receptacle.
7: FRMMS816 Metal studding, 8" wide, 16" OC, 16 gauge (+ / -) (+)
Included: Metal runner channel and studs, powder actuated drive pins (including shot), pan head screws, bridging, and installation labor.
Quality: 16 gauge, 8" wide, metal stud framing. Studs are set 16" on center (OC).
Excluded: Structural headers and cross bracing.
(-)
Included: Labor cost to remove metal studding and to discard in a job-site waste receptacle.
8: FRMMS816> Metal studding, 8" wide, 12" OC, 16 gauge (+ / -) (+)
Included: Metal runner channel and studs, powder actuated drive pins (including shot), pan head screws, bridging, and installation labor.
Quality: 16 gauge, 8" wide, metal stud framing. Studs are set 12" on center (OC).
Excluded: Structural headers and cross bracing.
(-)
Included: Labor cost to remove metal studding and to discard in a job-site waste receptacle.
9: FRMMS818< Metal studding, 8" wide, 24" OC, 18 gauge (+ / -) (+)
Included: Metal runner channel and studs, powder actuated drive pins (including shot), pan head screws, bridging, and installation labor.
Quality: 18 gauge, 8" wide, metal stud framing. Studs are set 24" on center (OC).
Excluded: Structural headers and cross bracing.
(-)
Included: Labor cost to remove metal studding and to discard in a job-site waste receptacle.
10: FRMMS818 Metal studding, 8" wide, 16" OC, 18 gauge (+ / -) (+)
Included: Metal runner channel and studs, powder actuated drive pins (including shot), pan head screws, bridging, and installation labor.
Quality: 18 gauge, 8" wide, metal stud framing. Studs are set 16" on center (OC).
Excluded: Structural headers and cross bracing.
(-)
Included: Labor cost to remove metal studding and to discard in a job-site waste receptacle.
11: FRMMS818> Metal studding, 8" wide, 12" OC, 18 gauge (+ / -) (+)
Included: Metal runner channel and studs, powder actuated drive pins (including shot), pan head screws, bridging, and installation labor.
Quality: 18 gauge, 8" wide, metal stud framing. Studs are set 12" on center (OC).
Excluded: Structural headers and cross bracing.
(-)
Included: Labor cost to remove metal studding and to discard in a job-site waste receptacle.
12: FRMMST8<+ Metal studding, 8" wide, 24" OC, 20 gauge (+ / -) (+)
Included: Metal runner channel and studs, powder actuated drive pins (including shot), pan head screws, and installation labor.
Quality: 20 gauge, 8" wide, non-welded metal stud framing. Studs are set 24" on center (OC).
(-)
Included: Labor cost to remove metal studding and to discard in a job-site waste receptacle.
13: FRMMST8+ Metal studding, 8" wide, 16" OC, 20 gauge (+ / -) (+)
Included: Metal runner channel and studs, powder actuated drive pins (including shot), pan head screws, and installation labor.
Quality: 20 gauge, 8" wide, non-welded metal stud framing. Studs are set 16" on center (OC).
(-)
Included: Labor cost to remove metal studding and to discard in a job-site waste receptacle.
14: FRMMST8>+ Metal studding, 8" wide, 12" OC, 20 gauge (+ / -) (+)
Included: Metal runner channel and studs, powder actuated drive pins (including shot), pan head screws, and installation labor.
Quality: 20 gauge, 8" wide, non-welded metal stud framing. Studs are set 12" on center (OC).
(-)
Included: Labor cost to remove metal studding and to discard in a job-site waste receptacle.
15: HVCACRPSP Central air - condenser repair - side panel (+) (+)
Included: Condenser side panel and replacement labor.
Notes: Pricing represents a single side panel. Additional considerations may be needed for panels that bend to form two sides of the condenser.
16: HVCACRPTP Central air - condenser repair - top panel (+) (+)
Included: Condenser top panel and replacement labor.
17: TCRDODRHZ Deodorize building - Ozone & hydroxyl treatment (+) (+)
Included: Ozone and hydroxyl generator, and labor.
Notes: Deodorize an area using a multi-phase oxidizing agent (i.e., ozone, hydroxyl radicals, H2O2, etc.) generator. Humans, animals, or pets cannot be present while machine is running. Item is based on residential applications.
Structural price list material components added for the October 2026 price lists
1: DRYCHAN>>14 Metal runner channel, 8" wide, 14 gauge
2: DRYCHAN>>16 Metal runner channel, 8" wide, 16 gauge
3: DRYCHAN>>18 Metal runner channel, 8" wide, 18 gauge
4: DRYCHAN>>20 Metal runner channel, 8" wide, 20 gauge
5: DRYMST>>14 Metal stud, 8" wide, 14 gauge
6: DRYMST>>16 Metal stud, 8" wide, 16 gauge
7: DRYMST>>18 Metal stud, 8" wide, 18 gauge
8: DRYMST>>20 Metal stud, 8" wide, 20 gauge
9: HVCRPSP Condenser side panel
10: HVCRPTP Condenser top panel
Structural price list items modified for the October 2026 price list
1: FRMMS414< Modified material component yield for pan head screws in (+) assembly.
2: FRMMS414> Modified a material component yield in (+) assembly and labor component yield in (-) assembly.
3: FRMMS416< Modified material component yield for pan head screws in (+) assembly.
4: FRMMS416> Modified material component yield for pan head screws in (+) assembly.
5: FRMMS418< Modified material component yield for pan head screws in (+) assembly.
6: FRMMS418> Modified material component yield for pan head screws in (+) assembly.
7: FRMMS614> Modified material component yield for pan head screws in (+) assembly.
8: FRMMS616> Modified material component yield for pan head screws in (+) assembly.
9: FRMMS618> Modified material component yield for pan head screws in (+) assembly.
10: FRMMST6>+ Modified material component yield for pan head screws in (+) assembly.
11: WDRRWDW Modified Note field in (+) definition to reference item is based on a standard operable window unit.
Miscellaneous changes made for the October 2026 price lists
1: Updated Connecticut Mattress Recycling Fee.

Comments


User_Picture